Sectoral

BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND

An open ended equity scheme investing in manufacturing and infrastructure sectors

Official details checked 06 September 2026 · latest available AMFI NAV dated 04 Sep 2026
Reference NAV₹79.6200BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND - Direct Plan - Growth · NAV date 04 Sep 2026
RiskometerVery HighCan change monthly
Expense ratioRegular 2.65%, Direct 1.06%Official stated figure; verify current TER
Allotment / launch05-March-10 (Regular Plan) and for Direct Plan - 01-Jan-13Bank of India Mutual Fund
Full official AMFI Scheme Summary Document available below.

Saved AMFI NAV is visible. Checking for the latest available AMFI report after page load · saved snapshot 04 Sep 2026.

Plain-language summary

Primarily market-linked growth exposure

The Scheme seeks to generate long term capital appreciation through a portfolio of predominantly equity and equity related securities of companies engaged in manufacturing and infrastructure related sectors. Further, there can be no assurance that the investment objectives of the scheme will be realized. The Scheme is not providing any assured or guaranteed returns.

Who may study it further

Investors with a long horizon who can tolerate meaningful falls in value.

Main risks to understand

Share-price volatility, valuation risk, concentration and tracking risk where applicable.

Not an income promise: The objective describes what the manager aims to do. It is not a guaranteed result, return or capital-protection statement.
Portfolio design

How the money may be invested

Equity and equity related securities of companies engaged in manufacturing and infrastructure and related sectors-80% to 100%-High Debt & money market securities/ instruments-0 to 20%-Low to Medium

SEBI category
Sectoral
Fund type
An open ended equity scheme investing in manufacturing and infrastructure sectors
Primary benchmark
BSE India Manufacturing Total Return Index (TRI) - 50% & BSE India Infrastructure Total Return Index (TRI) - 50%
Secondary benchmark
-
Top holdings

Use the latest monthly portfolio

Top holdings are the largest securities currently owned by the scheme. Names and weights can change every month, so a copied list can become misleading. Open the AMC's current official portfolio or factsheet below and look for this exact fund name.

Live verificationBANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUNDConfirm the reporting month, security name, sector and percentage of net assets.
Fund management

Manager and scheme tenure

Fund manager(s)
Mr. Nitin Gosar (w.e.f September 27, 2022)
Manager tenure on this scheme
Since 27 Sep 2022
Role / co-management
Primary Fund Manager Mr. Nitin Gosar having more than 20 years of Experience in Equity Research and Fund Management.

The tenure above is experience managing this scheme, not the manager's total career experience. For education, qualifications and prior roles, open the latest official AMC factsheet or manager profile below.

Plans and options

Latest NAV records

NAV is a per-unit accounting value. Compare returns, portfolio, risk and cost — never choose a fund only because its NAV looks low.

Plan / option reported by AMFINAVDate
BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND - Direct Plan - Growth₹79.620004 Sep 2026
BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND - Direct Plan - IDCW₹75.120004 Sep 2026
BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND - Direct Plan - Quarterly IDCW₹78.260004 Sep 2026
BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND - Regular Plan - Growth₹66.820004 Sep 2026
BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND - Regular Plan - IDCW₹42.590004 Sep 2026
BANK OF INDIA MANUFACTURING & INFRASTRUCTURE FUND - Regular Plan - Quarterly IDCW₹43.370004 Sep 2026
Costs and access

What you pay and how money moves

Stated expense ratio
Regular 2.65%, Direct 1.06%
Exit load
• For redemption/switch out upto 10% of the initial units allotted - within 1 year from the date of allotment: “NIL”. • Any redemption/switch out - in excess of the above mentioned limit would be subject to an exit load of 1%, if the units are redeemed/switched out within 1 year from the date of allotment of units. • If the units are redeemed/switched out after 1 year from the date of allotment of units : “Nil”
Minimum application
5000 · multiples of 1
SIP frequency
SIP - Weekly & Monthly, SWP - Monthly & Quarterly, STP - Daily, Weekly & Monthly
Minimum SIP amount
SIP - 1000, SWP - 1000 & STP - 1000
Minimum instalments
SIP - Weekly 12 & Monthly 6, SWP - Monthly 6 & Quarterly 4, STP - Daily 30, Weekly 12 & Monthly 6
Expense ratios change. Direct and regular plans normally have different expense ratios. Read the latest TER disclosure before investing.
Premium-free process

How a mutual-fund investment is paid

  1. Complete KYCIdentity, PAN, bank and contact verification are required.
  2. Choose route and optionUnderstand direct vs regular and growth vs IDCW before selecting.
  3. Choose SIP or lump sumSIP uses an automated mandate; lump sum is a one-time payment.
  4. Receive units at applicable NAVCut-off time, cleared funds and scheme rules determine the applicable NAV.
  5. Review, do not chaseTrack goal fit, risk, manager/mandate changes, costs and portfolio — not daily noise.
Original documents

Download and verify at source

The packaged Scheme Summary PDF is the official AMFI file, unchanged. Live AMC links are included for time-sensitive factsheets, top holdings and portfolios.

Source verification date: 06 September 2026. If a live document differs from this page, rely on the newer official document.

Need a human explanation?

Talk through the fund, costs and risks before deciding.

Educational support only — no promise of returns.

Call expert+91 9426587283 Chat with expertWhatsApp